| McQuay |
|
Alcan in conjunction with A & J Dixons
Access platform arrgts, assemblies and details. |
| Avery Denison |
 |
BNFL |
British Gypsum
On going projects including access platforms, staircases and Air Filtration Systems. |
|
Cadworks
Assisting Cadworks in conjunction with Solidworks with a variety of projects ranging from small prototypes to stair towers. |
Clyde Bergemann EEC
Design and Installation of a biomass dust extraction system for a renewable energy Power Station located in Eye Suffolk. Including Fan, Silo, Ductwork, Silencers and conveyors. |
 |
Corus
Ductwork and access systems. Test Laboratory Dust Extraction System. |
| Cover Products |
|
Envirohomes |
Fibropower Limited
Projects including access platforms, staircases and Air Filtration Systems. |
 |
Foster Wheelers |
Fireant & Associates
Design and installation of HVAC ductwork systems. |
|
General Electric |
Hubbway
Replacement building roof supplied with structural calculations |
 |
Fruedenburg
Gas turbine air intake housing retrofit design. |
Kimberly-Clark
Design and Installation of a Heat Recover System, including Axial Fan, Modulating Dampers, Support Steelwork and Access. |
|
Madison Filtration
Producing Technical brochures. Retrofit of tubeplate within a dust collector to suit cermic filters. |
SD Engineering
Small component design and maufacture, including hose reels, pneumatically operated dust chutes, pump mounts and small systems for maintenance purposes. |
 |
SEMB CORP Utilities / Wilton 10 |
| Shaws |
|
|